Construction of a system of dry drain wells and groundwater recharge

Construction of a system of dry drain wells and groundwater recharge

Construction of a system of dry drain wells and groundwater recharge

17/09/2020

With the motto "ALWAYS YOUR FOUNDATION" To aim for professionalism in the development process, Solar System Geotechnical and Foundation Joint Stock Company declares and commits to bringing the best quality to customers.

1. QUALITY MANAGEMENT SYSTEM

With the motto "ALWAYS YOUR FOUNDATION" To aim for professionalism in the development process, Solar System Geotechnical and Foundation Joint Stock Company declares and commits:
1. Strictly comply with the requirements of statutory requirements on quality and safety issues in construction.
2. Best service and technical support for customers.
3. Always work with a sense of responsibility, professional working environment so that the best coordination with customers.
4. Always improve management methods, techniques,  and technologies to create the most quality, safe and effective products that meet strict technical criteria.

2. WORKER SAFETY

2.1 Purpose

Requirements to ensure the safety, security, and fire protection in the process of implementing the contribution to complete the work to ensure the quality, safety, and schedule:
 Avoid injury to people, damage equipment damage.
Identify risks to overcome and minimize damage.
 Meet the requirements of the standards of the State, bring efficiency in work.
 Preventing harmful agents affecting the environment.

2.2 Occupational safety and hygiene during implementation

2.2.1 Dark labor protection

Workers on site must be equipped with protective clothing before
working. The protective equipment provided includes:
 Helmets.
 Protective clothing.
 Protective footwear.

2.2.2 Safety in construction

a) Safety

Do not move the Barie or safety marks.
Any accident or incident that occurs must be promptly reported to the Supervisor on duty and must be recorded in the incident book.
Injured people need to be given first aid and taken to a medical facility for treatment as quickly as possible.
Do not do anything that harms others, including negligence, negligence, or improper use of equipment.
Need to know how to recognize alarm signals and know how to act

b) Sanitation

The workplace should always be neat and clean.
Clean up trash and dispose of waste regularly after each shift.
The person performing the work must make sure that everything is safe, including work tools, that are well stored.

c) Transporting materials and equipment

The transportation of materials and equipment to the gathering yard must be guided and have a specific plan.
Warehouses to arrange and preserve materials and equipment must be predetermined on the site surface with the necessary quantity for construction. The location of this area must be convenient for transportation and unloading.
Materials and equipment gathered at the construction site must be stored in temporary warehouses or covered with tarps.

2.2.3 Protection of landmarks – monitoring location

a) Inclinometer position

The top of the inclinometer tube must be covered with a cap to prevent objects from falling into the tube, clogging the tube, and hindering the diaphragm wall displacement measurement. The part of the inclinometer pipe above the road surface needs an iron frame around it to protect the tube. In addition, the reflective cloth is required around it to warn people on the construction site and avoid damaging the inclinometer.

b) Location of underground water level monitoring

The top of the water level monitoring well pipe must have a cover to prevent objects from falling into the pipe, clogging the pipe, and hindering the measurement of groundwater level. The part of the good pipe above the road surface needs an iron frame around it to protect the pipe. In addition, the reflective fabric should be wrapped around to warn people on the construction site and avoid damage.

c) Piezometer position

The signal lines of the pore water pressure gauge are led to a favorable position to avoid the influence of the construction process. Make a protective box for the wire ends to avoid the weak influence of weather conditions.

5

         

có 1 đánh giá

5
1 đánh giá
4
0 đánh giá
3
0 đánh giá
2
0 đánh giá
1
0 đánh giá

Thành công

hello

Lỗi

hello

VA

2021-04-03 10:59:09

         
đánh giá
đơn vị thi công chuyên nghiệp
Chia sẻ

BÀI VIẾT LIÊN QUAN

Some project dry off the nail pit

Some project dry off the nail pit

Some typical projects that Thai Duong System has carried out is pumping to lower the groundwater level
MEASURES TO PREVENT WATER WALLS

MEASURES TO PREVENT WATER WALLS

The choice to use a certain water containment method will depend on the conditions and constraints for a given project. The...
IMPORTANT HYDRAULIC PROPERTIES OF SOIL - GROUND WATER_PART 1

IMPORTANT HYDRAULIC PROPERTIES OF SOIL - GROUND WATER_PART 1

The hydraulic properties of soil and groundwater materials depend on some of the following important hydraulic properties. Document translated from "The...
IMPORTANT HYDRAULIC PROPERTIES OF SOIL - GROUND WATER_PART 2

IMPORTANT HYDRAULIC PROPERTIES OF SOIL - GROUND WATER_PART 2

The hydraulic properties of soil and groundwater materials depend on some of the following important hydraulic properties. Document translated from "The...
DRILLING WELLS TO COLLECT UNDERGROUND WATER

DRILLING WELLS TO COLLECT UNDERGROUND WATER

There are different drilling methods for different geological conditions from hard rock (granite, dolomite) to loose sediment (alluvial sand, gravel). Each...
MEASURES TO COLLECT WATER

MEASURES TO COLLECT WATER

The water collection pit is the most basic measure of the method of lowering groundwater - draining the foundation pit. In...

CONTACT

SOLAR SYSTEM FOUNDATION AND GEOTECHNICS JOINT-STOCK COMPANY

Head office: 43A, Road No. 25, Cat Lai Ward, Thu Duc City

Hanoi representative office: No. 70 An Duong Vuong, Phu Thuong, Tay Ho, Hanoi

Phone: (08) 3742 3772

Email: contact@thaiduonghe.vn

Website: www.thaiduonghe.vn

                www.thaiduonghe.com

                www.ssfg.vn

SIGN UP FOR

Facebook

MAP