|
Construction unit: Hoa Binh Construction and Real Estate Trading Joint Stock Company
Scale
Construction area of nearly 7,000m2, including items such as:
The office tower block is 17 floors high with a total usable area of 15.623m2;
Hotel tower block - 25-story apartment block, in which the hotel area includes 226 rooms with an area of 70m2/room;
The 4-story podium has a usable area of 10,410m2 for the commercial center.
Contractor Solar System performs geotechnical monitoring, design calculation, and construction of hectare of underground water
Work |
The amount of work |
Calculation of Lowering underground water for basement construction |
twelfth |
Monitoring groundwater level |
24 cycles |
Monitor displacement of diaphragm wall (Inclinometer) |
24 cycles |
Observation of the neighboring works nghiêng |
24 cycles |
Monitoring settlement of neighboring works |
24 |
500 hectares - Hoa Phat Dung Quat Steel Factory(10.04.2020)
LAN ANH HOTEL( October 19, 2017 )
Vincom Quang Binh(February
28, 2017 ) HIYORI GRADEN TOWER(October 19, 2017)