Design a pumping system to lower the groundwater level, including: selecting the method of pumping to lower the groundwater level; Specify the input geotechnical parameters for calculation; Calculating the structure of the underground water pumping well, the water collection volume of each pumping well to lower the groundwater and selecting the appropriate pump; Calculating the number of pumping wells to lower groundwater for the whole project; Determine the lowering of the groundwater level at each location

Design a pumping system to lower the groundwater level including:

  • Selecting the method of pumping to lower the groundwater level - draining the foundation pit
  • Specify the input geotechnical parameters for calculation
  • Calculating the structure of the underground water pumping well, the water collection volume of each pumping well and selecting the appropriate pump
  • Calculating the number of pumping wells to lower groundwater for the whole project
  • Determine the lowering of the groundwater level at each location

 1. Some measures to dry the foundation pit hố

  • Surface drainage, diversion,
  • Pumping system to lower groundwater by needle well
  • Pumping system to lower underground water level by deep well
Vietnam bomb underground water pump bơm
Deep point well Needle well system

2. Input geotechnical parameters

In the calculation equations for the pump to lower the groundwater level, the most important input parameter is the permeability coefficient. The permeability coefficient can be obtained from laboratory test results such as constant water column, variable water column, from correlation equations or field pumping experiments.

Due to the non-formular effect of sampling, the soil samples do not fully represent the properties of rocks in nature. The results of laboratory experiments such as variable water column or constant water column are therefore not applicable to the analysis and design of the pumping system to lower the groundwater level. The most reliable method for determining the permeability coefficient is the field suction pump test.

In addition, when calculating the pump to lower the groundwater level, we need to consider whether the aquifer is pressurized water or non-pressurized water, the initial groundwater level elevation, aquifer thickness...

3. Structure of pumping wells to lower groundwater nước

The amount of water entering a well will depend on several factors:

  • Well radius
  • Permeability coefficient of soil and rock
  • Area of ​​active filter pipe
  • Filter hole area ratio
underground water pump bơm
Two types of aquifers are commonly encountered in groundwater lowering pumps Deep point well structure

4. Modeling the pump to lower the groundwater level

Some commercial software is commonly used to calculate and model groundwater levels quite accurately

lower groundwater

The Seep module in the Geo-studio software suite

pump to lower the groundwater level

Calculation of pump flow to lower groundwater in case of stable infiltration using Plaxis 2D . software

underground water pump bơm

Modflow software simulates groundwater level lowering for both stable and unstable water levels.

In addition, the calculation of lowering the groundwater level is carried out by different methods. In the construction of deep excavations, the progress of lowering the groundwater level should be carried out in stages, in order to ensure maximum savings while the excavation work still takes place in dry conditions. 

Lower the groundwater level mực

Lower the groundwater level to a depth of 6m

dry off the nail pit

Lower the groundwater level to a depth of 12m

dry off the nail pit

Lower the groundwater level to a depth of 15m

0

         

có 0 đánh giá

5
0 đánh giá
4
0 đánh giá
3
0 đánh giá
2
0 đánh giá
1
0 đánh giá

Thành công

hello

Lỗi

hello

Chia sẻ
Database Error

Công Ty Truyền Thông Và Quảng Cáo Siêu kinh doanh

A Database Error Occurred

Error Number: 1055

Expression #21 of SELECT list is not in GROUP BY clause and contains nonaggregated column 'thaiduonghe_db.lg.title' which is not functionally dependent on columns in GROUP BY clause; this is incompatible with sql_mode=only_full_group_by

SELECT `cle_post`.*, `lg`.`title`, `lg`.`content`, `lg`.`excerpt`, `lg`.`language` FROM `cle_post` JOIN `cle_relationships` as `r` ON `r`.`object_id` = `cle_post`.`id` JOIN `cle_relationships` as `r2` ON `r2`.`object_id` = 11 AND `r`.`category_id` = `r2`.`category_id` JOIN `cle_language` as `lg` ON `lg`.`object_id` = `cle_post`.`id` WHERE `public` = 1 AND `trash` = 0 AND `post_type` = 'post' AND `cle_post`.`id` <> '11' AND `r2`.`object_type` = 'post' AND `lg`.`language` = 'en' AND `lg`.`object_type` = 'post' GROUP BY `r`.`object_id` ORDER BY `order`, `created` desc LIMIT 6

Filename: /home/thaiduonghe/domains/thaiduonghe.vn/public_html/core/MY_Model.php(1) : eval()'d code(1) : eval()'d code

Line Number: 190